Specialist Chamber & Manhole Rehabilitation Construction at Pembroke Dock

Oct 30
4 min read

Arch Services recently completed specialist chamber construction and manhole rehabilitation works at Pembroke Dock, supporting DT Civils & Utilities during a rising main installation project.


The works involved constructing a new chamber base, connecting into an existing manhole and completing internal benching to support the installation. Working alongside the DT Civils & Utilities team, Arch Services provided specialist civil engineering support in challenging site conditions where existing underground services complicated excavation and construction activities.


Despite the difficulties encountered, the project was successfully completed to a high standard, earning positive feedback from the client’s Project Manager.


Client feedback from DT Civils & Utilities following specialist chamber construction and manhole connection works completed by Arch Services at Pembroke Dock.
Positive feedback from DT Civils & Utilities following the successful completion of specialist chamber and manhole works at Pembroke Dock.

Supporting DT Civils & Utilities With Specialist Infrastructure Works

DT Civils & Utilities required specialist support from Arch Services to undertake chamber and manhole construction works associated with a rising main installation at Pembroke Dock.


Rising mains are an important component of wastewater infrastructure, transporting wastewater under pressure where gravity drainage is unsuitable. Their installation can require associated civil engineering works, including the construction of chambers and connections to existing drainage infrastructure.


For this project, Arch Services was responsible for completing specific elements of the chamber and manhole rehabilitation works, working alongside the wider installation team to support the successful progression of the project.


The scope of works included constructing the chamber base, connecting into the existing manhole and completing the internal benching.


These activities required careful coordination with the ongoing excavation works and consideration of the existing underground infrastructure.



Overcoming Challenging Site Conditions

One of the principal challenges encountered during the project was the presence of existing underground services within the working area.


The DT Civils & Utilities team needed to excavate beneath these services, creating additional complexity and affecting the time available for the associated chamber construction and connection works.


Working around existing underground infrastructure requires careful planning and coordination, particularly where multiple contractors are operating within the same excavation area.


For Arch Services, this meant adapting to the progress of the excavation works while remaining available to complete the required construction activities.


Despite the disruption and time lost during the excavation process, the Arch Services team continued working collaboratively with DT Civils & Utilities to complete the project.


This flexible approach helped maintain progress and demonstrated the importance of experienced specialist contractors when undertaking complex civil engineering works.


Specialist Chamber Construction & Manhole Rehabilitation Works

Arch Services undertook three principal elements of the project, providing the specialist construction work required to support the rising main installation.


Chamber Base Construction

The first element involved constructing the chamber base. Chamber bases form an important part of drainage infrastructure, providing the foundation for the associated chamber structure and its internal components.


Accurate construction is essential to ensure that the chamber can accommodate the required connections and function as intended within the wider drainage system.

Arch Services completed the chamber base construction as part of its agreed scope of works.


A member of the Arch Services team, entering a manhole in orange high-visibility PPE.

Connection Into The Existing Manhole

The second element involved connecting the new installation into an existing manhole.


Working with existing drainage infrastructure can introduce additional challenges, particularly where access is restricted or underground services are present.


Connections must be carefully executed to integrate new infrastructure with existing assets while maintaining the integrity of the surrounding structure. Arch Services completed the required connection works as part of the wider rising main installation.


A manhole entrance, painted grey, showing underground connecting pipework

Internal Manhole Benching

The final element involved completing the internal benching. Manhole benching provides shaped surfaces within a chamber, helping direct wastewater towards the designated flow channel and reducing areas where debris and sediment may accumulate.


Correctly formed benching is an important consideration in the construction and maintenance of drainage infrastructure.


By completing the internal benching, Arch Services delivered the final element of its specialist chamber and manhole construction responsibilities.


Successful Project Delivery & Positive Client Feedback

Despite the challenges presented by the existing underground services and the additional time required for excavation, Arch Services successfully completed its agreed works.

The team’s flexibility, cooperation and commitment to maintaining high workmanship standards were particularly appreciated by DT Civils & Utilities.


Following completion, Kyle Steed, Project Manager at DT Civils & Utilities, contacted Arch Services to express his appreciation for the support provided throughout the project.



Client Testimonial: DT Civils & Utilities


“Thank you for your assistance with this project, because it wasn’t straight forward. I'd like to pass on my regards to the team for all the help and assistance as I know it wasn’t an easy task. They lost a lot of time whist our team were digging under all the services and they just got on with it and got the job done to a very high standard, so it’s massively appreciated.”

Kyle Steed, Project Manager, DT Civils & Utilities


This feedback highlights the importance of reliable specialist contractors who can work effectively alongside other construction teams, particularly when unforeseen challenges affect project schedules.


For Arch Services, the successful completion of the Pembroke Dock works reflects the company’s commitment to professional delivery, collaborative working and maintaining high standards across its civil engineering and drainage infrastructure projects.



Specialist Civil Engineering Support Across South Wales & Beyond

The Pembroke Dock project demonstrates the value of experienced civil engineering support when undertaking works involving existing drainage infrastructure, underground utilities and complex site conditions.


From chamber construction and manhole connections to specialist drainage repairs and infrastructure maintenance, Arch Services supports commercial clients, utility providers and civil engineering contractors with a range of specialist services.


With over 30 years of experience, Arch Services operates across South Wales, the South West of England and the West Midlands, providing practical solutions for challenging drainage and infrastructure requirements.

Our teams understand the importance of coordinating with principal contractors, working around existing infrastructure and maintaining professional standards throughout each project.


Whether supporting a larger utility installation or undertaking specialist drainage works, we focus on delivering reliable services that meet the requirements of each project.


Discuss Your Civil Engineering & Drainage Infrastructure Requirements

If your organisation requires specialist support with chamber construction, manhole works, drainage infrastructure repairs or associated civil engineering services, Arch Services can help.


Our experienced team works alongside commercial contractors, utility providers and infrastructure operators to deliver specialist drainage and civil engineering solutions across South Wales and the surrounding regions.


Contact Arch Services today on 0800 707 6771 or email info@archservices.co.uk to discuss your project requirements.

Comments


bottom of page